Italy, Milan

100%

Renewable Energy
Supply*
*subject to clients needs

80 kW

Average Cooling Power/ Rack

24/7

Services Available

1000 m²

Total IT-Space
Available

40 MW

Potential
Power Supply

Dec '22

Space
Available

Hønefoss I NO-DC1

The first facility is currently under construction in Hønefoss, close to Oslo and Norway’s largest international airport.

This facility will be a 3,8 MW IT colocation facility, prepared with the potential to support high-density racks for HPC. The power supply potential is up to 40 MW in the site area. The site can also support standard densities – 5 kW, up to HPC (+100kW) per rack.

Cooling setup

Air cooling:

  • up to 20 kW cooling power per rack
  • ca. 80% yearly indirect free cooling
  • chilled water temperature (20/26 indoor, and 18/24 outdoor)
  • Avg. cPUE 1.15 approx. (only considering the cooling infrastructure)

Hot water direct cooling:

  • 80 kW average cooling power per rack
  • ca. 100% yearly indirect free cooling

Power setup

  • 3,8 MW IT-load
  • 10 MW of IT power is available at the plot, extensible to 40 MW
  • 100% renewable energy supply. Electricity spot price: €0.036/kWh average over the last 16 years
  • PPA long-term power supply contracts directly with the supplier (optional)

Technical setup

  • Location:
    • Hønefoss, close to Oslo and Norway’s international airport
    • Average temperature 4.6°C
    • Large plot with space for further data centre buildings
  • Colocation
    • Open space, flexible divisions, compartments, enclosures
    • Total IT space available: ca. 1000 m²
    • Max. no. of racks: circa 700 (based on 60 cm racks)
    • 16 two-row blocks of max. 44 racks each (based on 60 cm racks)
    • High power density blocks for liquid cooled compute capacity on demand

     

  • Redundancy/Resiliency:
    • Tier 3: 2N redundancy in power and fiber. N+1 in cooling
    • Back-up power (UPS, gensets, double power feeder), 20 kW redundant power supply per rack in average
  • Connectivity:
    • Carrier neutral data centre
    • Expected connections to IXPs in Oslo and abroad as well as direct connections to the main cloud providers
    • Private line ethernet services on request
    • Cross-connects within the data centre on demand
  • Expected one-way latency values:
    • London (14.9 ms)
    • Frankfurt (14.4 ms)
    • Stockholm (6.8 ms)
    • Dublin (18.2 ms)
    • Paris (19.9 ms)
    • Amsterdam (12.6 ms)

 

  • Services and operations:
    • Initial set-up
    • Remote hands packages
    • 24/7 services available
    • Flexible SLA offering
  • Other:
    • Monitoring features available (live PUE, CO2e emissions, performance, etc.)
    • CO2e measuring, reducing, and offsetting services as required
    • Heat reuse is under consideration to reduce operational costs and carbon footprint

 

Start to decarbonise your data

How much CO2e would you save if you moved your data load to AQ Compute?
Select your HPC needs and get your CO2e avoidance.



500 kW 5000 kW

Country
AQ-OSL1

Air cooling (Norway)

Liquid cooling
Heat recovery

Your avoidance by relocating to AQ Compute:

4

Offset your CO2eq emissions and validate your CO2eq avoidance with AQ Green TeC.

Disclaimer

Spain

Barcelona

Get more

Italy

Milan

Get more